Excellent quality Cross-Laminated Hdpe Waterproof Membrane - Water-based PU waterproof coating – Hongyuan

Short Description:

 Water-Based PU waterproof coating , Made of water-based Polyurethane dispersion as main film -forming material , Adding pigments and fillers and other additives . Curing film through water volatilization .Product classification and specification : PU coatingProduct classificationcolor...


Product Detail

Product Tags

Related Video

Feedback (2)

By using a full scientific excellent administration method, great quality and fantastic religion, we get good reputation and occupied this discipline for Waterproof Liquid Rubber Membrane, Self Adhesive Modified Bitumen Flat Roof, Waterproof Materials, The concept of our company is "Sincerity, Speed, Service, and Satisfaction". We will follow this concept and win more and more customers' satisfaction.
Excellent quality Cross-Laminated Hdpe Waterproof Membrane - Water-based PU waterproof coating – Hongyuan Detail:

 Water-Based PU waterproof coating , Made of water-based Polyurethane dispersion as main film -forming material , Adding pigments and fillers and other additives . Curing film through water volatilization .

Product classification and specification :

 PU coating

Product classification

color

Specification

Construction method

UV / No-UV

white

25kg/barrel

Roller,brush,spary

 

 Primer

Product classification

color

specification

Construction method

 Water based Reaction type primer

A: white  B:yellow

A:10kg/barrel  B:1kg/barrel

Roller /brush

Product application and features:

Water-based materials , Green and environmental friendly .

Single component , instant use and easy to apply .

Coating film has good water resistance, good corrsion resistance and Well imporosity .

Long-term UV resistance .

The PU coating film has high tensile strength , good elongation and excellent high and low temperature resistance

The coating film is compact and fee from needle holes and bubbles .

 

Technical date :

                          

No

 

Item

Technical date

1

Soild content /%

≥60

2

Density/(g/ml)

报告实测值

3

Surface dry time /h

≤4

4

Hard dry time/h

≤12

5

Tensile strength/MPA

≥2.0

6

Elongation at break/%

≥500

7

Tear strength /(N/mm)

≥15

8

Bending at low temperature /℃

-35℃,No cracking

 

9

Water impermeability

0.3MPa,120min,imporosity

10

Elastic recovery/%

≥70

11

Bonding strength /MPA

 

 

 

Standard test conditions

≥1.0

Wet substrate

≥0.5

 

 Applicable scope:

Application to waterproof of roofing、 undergroud and Metal roof .washing and totile etc waterproof project .

 

Working poins:

Base layer treatment -Brush primer-Detail enhancement treatment-Coating film of large area–closing treatment-inspection

Base layer treatment: the base layer should be soild and dry and does not contain mud and sand ,litters;The internal corner should be treated into smooth arc;  Handle the substrate when new the roof and metal roof ;

Brush primer: Mix primer A and B as the percent 10:1 , stir thoroughly,then Mix with water as the percent 30%–50%, stir thoroughly and brush on the substrate, dosage 0.05~0.1kg/m2,   dry time 10~20min, If have rest , can use in future .

Detail enhancement treatment: The deformation seam , water fall opening , protruding pipe , eaves gutter , and gutter etc part , Set up enhanced waterproof layer or perform corresponding procedures according to requirements of treatment of key and difficult points .

Coating film of large area : Can brush or spray . must be brush 2 to 3 times , During each pass of coating , should be wait 2~4 hours ,Brush the next time , Vertical construction.

Closing treament: after waterproof layer area is finished , the waterproof layer should be closed , the closing treatment should be in compliance with the requirements of treatment of key and difficult points .

Inspection: Do as the requirement of different area’rule .

Transport and storage:

1.Products of different types or specifications should be stored separately during storage and transportation.
2.Against insolation and rain , the storage temperature should be 5℃-35℃.
3.The storage period is one year .

Precautions:
1. No work is allowed to be carried out in snowy and rainy days or days with wind being 5℃ to 35℃。 
2.Applicable to wet base surface: work can be carried out on the wet base surface as long as there is no visible water on the base surface , Therefore , it can be applied in rainy season . Notice : cannot work under blazing sun .

3.The ambient temperature of work shall be 5℃-35℃。

4. Before construction PU coating , Need Primer to handle the substrate .

 

1.0mm Dosage 2.0kg/m2-2.2kg/㎡


Product detail pictures:

Excellent quality Cross-Laminated Hdpe Waterproof Membrane - Water-based PU waterproof coating  – Hongyuan detail pictures


Related Product Guide:
Falmouth Preservation Alliance Advocates For Poor House | Falmouth News | Asphalt Shingle
Waterproofing Roofing Membrane Market Investigation by Application, Technology and Product Type | Pvc Sheet Supplier

Our growth depends around the superior machines, exceptional talents and consistently strengthened technology forces for Excellent quality Cross-Laminated Hdpe Waterproof Membrane - Water-based PU waterproof coating – Hongyuan, The product will supply to all over the world, such as: Johor, Singapore, Sierra Leone, Our mission is "Provide Goods with Reliable Quality and Reasonable Prices". We welcome customers from every corner of the world to contact us for future business relationships and achieving mutual success!
  • Timely delivery, strict implementation of the contract provisions of the goods, encountered special circumstances, but also actively cooperate, a trustworthy company!
    5 Stars By Dominic from Miami - 2016.05.21 12:31
    The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 Stars By Debby from Angola - 2016.08.16 13:39
    WhatsApp Online Chat !