Hot Sale for High Elastic Thick Acrylate Waterproof Coating - SBS modified bitumen membrane – Hongyuan Detail:
SBS modified bitumen membrane is made by saturating the base in bitumen, or thermoplastic elastomer (such as styrene butadiene-SBS), reinforced with polyester or fiberglass, finishing the upward face with fine sands, mineral slates(or grains) or polythene membrane etc.
Characteristic:
Good impermeability; Possess good tensile strength, elongation rate and size stability which could be well suited the substrate distortion and crack; SBS modified bitumen membrane is specially being applied in the cold area with low temperature, while APP modified bitumen membrane is applied in the hot area with high temperature; Good performance in anti-puncture, anti-broker, anti-resistance, anti-erosion, anti-mildew, anti-weathering; Construction is convenient, the melt method can operate in four seasons, joints are reliable
Specification:
Item |
Type |
PY PolyesterG GlassfibrePYG Glassfibre enhance polyester feltPE PE FilmS Sand
M Mineral |
||||||
Grade |
Ⅰ |
Ⅱ |
||||||
Reinforcement |
PY |
G |
PYG |
|||||
Surface |
PE |
San |
Mineral |
|||||
Thickness |
2mm |
3mm |
4mm |
5mm |
||||
With |
1000mm |
Applicable scope:
Suitable for civil building roofing, underground, bridge, parking, pool, tunnel in the line of waterproofing and dampproof, especially for the building under high temperature. According the roofing engineering stipulation, APP modified bitumen membrane could be used in the Grade Ⅰ civil building and industrial building which has special waterproofing requirement.
Storage and transportation instructions
When storage and transportation, Different types and sizes of products shall be stacking separately, should not be mixed. Storage temperature should not be above 50℃, the height is not more than two layers, in the course of transportation, membrane must stand.
The stacking height is not more than two layers. To prevent the tilt or pressure, when necessary cover the felt fabric.
In normal conditions of storage and transportation, storage period is a year since the date of production
Technical data:
SBS [Confirming to GB 18242-2008]
No. |
Item |
Ⅰ |
Ⅱ |
|||||||||||
PY |
G |
PY |
G |
PYG |
||||||||||
1 |
Soluble content/(g/m ²)≥ |
3cm |
2100 |
* |
||||||||||
4cm |
2900 |
* |
||||||||||||
5cm |
3500 |
|||||||||||||
Test |
* |
No flame |
* |
No flame |
* |
|||||||||
2 |
Heat resistance |
℃ |
90 |
105 |
||||||||||
≤mm |
2 |
|||||||||||||
Test |
No flow, no dripping |
|||||||||||||
3 |
Low temperature flexibility/℃ |
-20 |
-25 |
|||||||||||
No crack |
||||||||||||||
4 |
Impermeability 30 minutes |
0.3MPa |
0.2MPa |
0.3MPa |
||||||||||
5 |
Tension |
Maximum/(N/50mm) ≥ |
500 |
350 |
800 |
500 |
900 |
|||||||
Secondly-Maximum |
* |
* |
* |
* |
800 |
|||||||||
Test |
No crack, no apart |
|||||||||||||
6 |
Elongation |
Maximum/%≥ |
30 |
* |
40 |
* |
* |
|||||||
Secondly-Maximum≥ |
* |
* |
15 |
|||||||||||
7 |
Oil Leaking |
Pieces≥ |
2 |
Product detail pictures:
Related Product Guide:
Peet Roofing Educates Homeowners About Common Misconceptions After a Hail Storm | | Epdm Swimming Pool
Do Metal Roofs Save Energy? | Earth911.com Do Metal Roofs Save Energy? | Asphalt Shingle
With our loaded encounter and considerate services, we have now been recognized as a trustworthy supplier for lots of worldwide consumers for Hot Sale for High Elastic Thick Acrylate Waterproof Coating - SBS modified bitumen membrane – Hongyuan, The product will supply to all over the world, such as: Iran, Korea, Czech, We warmly welcome domestic and overseas customers to visit our company and have business talk. Our company always insists on the principle of "good quality, reasonable price, the first-class service". We have been willing to build long-term, friendly and mutually beneficial cooperation with you.
By Natividad from Tajikistan - 2016.09.09 10:18
The factory technical staff not only have high level of technology, their English level is also very good, this is a great help to technology communication.
By Sara from Iran - 2016.11.20 15:58